CREMASCOLI CHEMICAL s.p.a.
location: Segrate (MI), IT
client: Giuliana Cremascoli Chemical s.p.a.
year of design: 2000
years of construction: 2000 – 2002
gross floor area: 1.200 m²
volume: 4.400 m³
construction cost: about 450.000 Euro (EUR)
task: design and construction supervision
short description: extraordinary maintenance and adaptation of the systems to prevent fires in storage structure for pharmaceuticals with temporary storage of material of the “G. C. Chemical S.P.A.”